The decision in brief
Our assessment
Shortlist MRPeasy when production planning is central and a per-user model fits the team. Compare the tier required by your workflow, not just the first price on the page.
What to know about pricing
Our last verified price is due for a fresh source check.
Annual payment offers a separate discount. Additional users above 10 are sold in bundles; do not multiply the first-ten seat rate without checking.
Compare the full cost of your workflow, including seats, order volume, add-ons, and implementation where applicable. A starting price is not a quote for your business.
Strengths and tradeoffs
Useful strengths
- MRPeasy combines production planning, inventory, purchasing, CRM, and shop-floor reporting for manufacturers.
- Material requirements and scheduling connect demand, stock, work orders, and purchasing.
Points to check
- Reliable outputs depend on accurate items, bills of materials, routings, lead times, and opening balances.
- Features, allowances, integrations, and support can vary by the current plan and region.
Evaluate the factory workflow
MRPeasy's plan table places BOM management, production planning, and supply-chain functions in Starter. That makes it a relevant candidate for a small manufacturer whose problem begins with components and work orders.
Prepare your material units, recipes, purchasing lead times, and production steps first. Software can expose a shortage, but inconsistent opening stock and unclear routing assumptions will still undermine the schedule.
Check the feature gates before comparing price
The published plan table places subcontracting in Professional; multiple stocks, multiple production sites, and revision control appear in Enterprise. Unlimited has a two-user minimum. These requirements can change the price of a seemingly small deployment.
Count everyone who needs a paid seat, then ask how shop-floor reporting and integrations affect that count. Do not use the entry price as a quote for every employee or every manufacturing workflow.
Partial production deserves its own test
MRPeasy's change log documents optional partial manufacturing completion. Check the relevant setting and how workers report the final operation before you run the trial.
Run the same 20-unit job as Katana. Receive only part of the purchase, finish 8 units, and ship 6. Inspect open balances instead of relying only on a job status label. Record whether planned incoming goods can be used and how that affects your material-availability screen.
Evidence to collect before choosing
Export or capture the starting balances, each stock movement, remaining purchase quantities, and remaining sales quantities. Ask for an explanation wherever the system differs from the arithmetic ledger.
Choose on the workflow your team can reconcile and maintain. We have not run these tasks in an MRPeasy account and do not claim one interface is faster or easier than another.
A few more useful answers.
What size manufacturer is MRPeasy designed for?
MRPeasy says it is built for small and midsize manufacturers and distributors, with an indicated range up to 200 employees. Fit depends more on workflow complexity, users, sites, transactions, and compliance than employee count alone.
Does the Starter plan include all advanced manufacturing tools?
No. Core planning and inventory functions start lower, while functions such as quality control, serial numbers, subcontracting, multi-site, barcoding, approvals, version control, and API access are associated with specified higher plans. Check the live matrix.
Can MRPeasy integrate with accounting and ecommerce tools?
It documents integrations with systems such as QuickBooks Online, Xero, Shopify, WooCommerce, BigCommerce, ShipStation, Power BI, and Zapier. Test field mapping, sync direction, timing, exceptions, and month-end reconciliation.
What is the safest MRPeasy implementation approach?
Name an internal owner, document the future workflow, cleanse items and units, pilot a product family, train each role, reconcile stock and costs, and set go-live acceptance criteria. Keep a controlled fallback until purchasing, production, shipping, and accounting agree.
Sources and research scope
By the ArtisanSW Research Desk. This assessment draws on published product information. It does not claim firsthand product testing or measured customer outcomes. Confirm material requirements in a trial or with the vendor.
- MRPeasy pricing and plan requirements
- MRPeasy change log: partial manufacturing completion
- MRPeasy software settings
Have a correction? Email info@artisansw.com with the claim and a supporting source.
Keep the terms in view
Plans, prices & the important limits
Prices are checked against official sources and show the verification date. Currency, billing commitment and usage charges matter; these are not like-for-like total costs.
Our last verified price is due for a fresh source check.
Checked Oct 2, 2026Official pricing ↗Annual payment offers a separate discount. Additional users above 10 are sold in bundles; do not multiply the first-ten seat rate without checking.




